The Eastern elevation of the building was demolished and the building extended creating an additional learning space, amenities, staff kitchen and undercover outdoor area. The preschool was kept fully operational during these works. An acoustic rated operable wall was installed between the new and existing floor spaces to allow the preschool to create two separate learning spaces or one large open learning space. The existing disabled amenities were also reconfigured and upgraded to bring them up to current legislative requirements.